DATA CENTER MIGRATION — CO-LOCATION, RACK & STACK
Project Details
Complete physical relocation of server and network hardware from a legacy data center to a modern co-location facility. Scope included site assessment, rack planning, hardware decommission, rack-and-stack installation, cross-connect provisioning, and a phased zero-downtime cutover.DATA CENTER MIGRATION — CO-LOCATION, RACK & STACK
- Date : 2024
- Client : Confidential
- Skills : Data Center Operations, Network Infrastructure, Rack & Stack
- Location : Undisclosed
Client Review.
The migration was executed flawlessly. Every rack, every cable, every cross-connect landed exactly where it needed to be, and we never lost a single production system. The level of planning and on-site coordination was outstanding.
Full-scope data center co-location migration: decommissioned and physically relocated servers, networking equipment, and rack-mounted hardware from the legacy facility to a modern co-location provider. Scope of work: • Site assessment and rack planning at destination co-location facility. • Hardware inventory, labeling, and decommission at the source data center. • Physical rack-and-stack installation at the co-location cage, including cable management and patch panel configuration. • Cross-connect provisioning and ISP handoff at the new facility. • Phased cutover maintaining critical systems online throughout the migration window. • Final testing, burn-in, and sign-off. Delivered a clean, organized, and fully documented infrastructure footprint in the new facility with zero unplanned downtime.
